Soventix Powerful Returns

Knowledge to support a sustainable future.

We are part of an international group of companies specialized in renewable energy generation projects

WHO WE ARE

We are a team of professionals committed to generating value for our clients and stakeholders, providing creativity and experience in our renewable energy projects and services for a more sustainable future.

Equipo

WHAT WE DO

Consulting and studies

With solid industry knowledge and a multidisciplinary team, we advise investors and investment funds in the acquisition and portfolio management of photovoltaic projects.

Development and management

We develop photovoltaic portfolios of all scales, from the search for land until the projects have all of their permits and are ready to build.

Engineering and construction

We carry out the technical studies and engineering designs of our projects, or those of our clients, executing the complete construction in EPC or BOS modalities.

Operation and maintenance

We provide operation, maintenance and optimization services for photovoltaic parks of different scales, whether they are our own developments or projects developed by third parties.

OUR EXPERIENCE

Corrales | 10.7MWp

Renewable Resources Group, owner of the 10.7 MWp Corrales project, located in the municipality of Peñaflor, Metropolitan Region, commissioned Soventix to supervise the development stage of this photovoltaic park. Subsequently, Soventix supervised its construction to ensure the construction conditions requested by the client. This project started operations in 2022.

Codornices | 3MWp

Arroyo Energy, owner of the 3 MWp Codornices project, located in the municipality of Talca, Maule Region, commissioned Soventix to supervise the development phase for this Photovoltaic Park. Once the development phase was completed, Soventix supervised the construction to ensure quality. This project began operations in 2020.

Catemu | 2,4MWp

The medium scale Catemu project is a 2.4MWp photovoltaic park located in the municipality of Catemu, Valparaiso Region. It was developed by Soventix, who discovered the opportunity and then developed it to reach a ready to build status. The project began operations in 2019.

Canesa | 3,45MWp

Soventix was in charge of the supervision of the development stage of the 3.45 MWp Canessa project owned by Arroyo Energy. This project is located in the municipality of Ovalle, Coquimbo Region. Once the project was declared under construction, Soventix supervised the construction of the project to ensure the client’s conditions. This project began operations in 2019.

Pesaro | 3MWp

The medium scale Pesaro project is a 3MWp photovoltaic farm located in the San Antonio district of Valparaíso. The construction of this project was tendered by Rockville Capital and awarded to Soventix, which is in charge of the engineering and construction of this photovoltaic park. It is currently in the construction stage and is expected to be operational in 2023.

El Dorado | 300kWp

El Dorado, 300kWp, located in El Dorado, Argentina, is a photovoltaic project connected to the distribution network of an electric cooperative. Soventix was in charge of the engineering, purchase of main equipment and construction supervision of this park. The project began operations in 2020.

Don Pedro | 10MWp

Arroyo Energy, owner of the 10 MWp medium scale Don Pedro project, located in the municipality of Ovalle, Coquimbo Region, commissioned Soventix to supervise the development phase for this photovoltaic park. After the development phase, Soventix supervised the construction to ensure quality and compliance according the conditions of the client. This project achieved start up in 2020.

Domeyko | 66MWp

Soventix developed the Domeyko Photovoltaic Park project located in the Atacama Region. Soventix encouraged the national electricity system expansion plan for the execution of the interconnection substation of the project, which led to obtaining the interconnection permit in July 2022. To date, the environmental permits for a peak power of up to 93 MWp have been updated and the project has been declared under construction. The project reached ready to build status and is in the process of being sold. The project is expected to start operations by the end of 2024.

El Sena | 426kWp+72kWh BESS

The El Sena photovoltaic project of 426kWp and more than 72kWh of lithium-ion batteries, located in Sena, Bolivia, is a project connected to a micro-grid of the state distributor ENDE, based on diesel generators combined with storage. Soventix was in charge of the engineering, equipment procurement and construction of this photovoltaic park. The project began operations in 2018.

Cachiyuyo | 53MWp

Soventix developed the Cachiyuyo 53MWp Photovoltaic Park project, located in the Atacama Region. Cachiyuyo reached ready-to-build status in July 2022, when it was sold to an international investor. The project is currently declared under construction and is expected to start operations in 2024.

SOVENTIX IN THE WORLD

Soventix en el Mundo
L

Bandera Chile

Chile

+56 9 8829 1128
info@soventix.cl
www.soventix.cl

L
Bandera Reino Unido

Reino Unido

+44 (0) 203 696 1170
info@soventix.com
www.soventix.com

L

Bandera Alemania

Alemania

+49 281 40 56 77-0
info@soventix.de
  www.soventix.com

L

Nigeria

+234 1633 1725
info@soventix.com
www.soventix.com

L

Bandera Sudáfrica

Sudáfrica

L

Rwanda

+44 (0) 203 696 1170
info@soventix.com
www.soventix.com

L

Kenya

+255-784-670397
info@soventix.com
www.soventix.com